24/7 Emergency Call-Out

Dark Overlay

Education

Reliable Power Solutions for Education Facilities

Whether you manage a school or a large educational campus, continuous heat and power is essential for safety, comfort, and uninterrupted learning. Power failures can disrupt classes, damage equipment, and create compliance risks – issues no Facilities Manager wants to face.

Why Power Continuity Matters for Education

  • Protect Learning Environments – Ensure classrooms, labs, and IT systems stay operational.
  • Meet Compliance Standards – Avoid costly downtime and maintain health and safety obligations.
  • Peace of Mind for FM Teams – Reliable backup solutions reduce risk and stress for on-site managers.

Optimising CHP Systems for Efficiency

Combined Heat and Power (CHP) systems generate heat and electricity simultaneously, making them ideal for larger educational sites with significant hot water demand. Campuses with swimming pools, sports facilities, or student accommodation often benefit most from CHP technology for heating and power.

These systems lower energy costs, can reduce carbon emissions by up to 30%, and help meet sustainability targets.

At Shenton Group, we maintain and optimise CHP systems to ensure they operate at peak efficiency and deliver the highest possible return on investment. For educational facilities running long hours, this means lower bills, greener energy, and reliable performance without compromise.

Backup Power Solutions

If the unthinkable happens and mains power fails, having a backup generator system ensures your site isn’t left in the dark. We design robust solutions for resilience and compliance, giving FM teams confidence that critical life safety services such as emergency lighting and lifts will continue to operate.

When a permanent generator isn’t required, our Power Call emergency generator rental connection service provides rapid response and peace of mind.

Ready to Protect Your Campus?

Contact Us

Our Latest News

  • Case Study: Powering 150 Fibre Network Sites with Uninterrupted Power Solutions

    Location: NationwideClient: Leading National Fibre Network ProviderEnd User: Businesses and Consumers NationwideSector: Fibre Network Infrastructure Products/Services Used: Client Overview Our client is a leading national fibre network provider operating across 190+ sites. They deliver high-speed connectivity to businesses and consumers, relying on resilient power infrastructure to maintain continuous service availability. Their operations are critical to … Continued

  • Case Study: Shenton Group Provides Reliable Power to Global Biopharmaceutical Distribution Centres

    Sector: PharmaceuticalsLocation: Liverpool Products/ Services Background A global biopharmaceutical company, based in the north west of the UK, was expanding due to the increase in demand for pharmaceutical supplies during the COVID-19 pandemic. Further manufacturing and cold storage were required on-site, and temporary power was needed for this expansion. Project Overview Shenton Group was tasked … Continued

  • Case Study – Porton Science Park

    Client: Wiltshire CouncilSector: Local AuthorityLocation: Porton Down Products/Services Background Porton Science Park provides a platform for Science and Technology to innovate in an environment that welcomes and supports new business start ups. Working in partnership with Wiltshire council and DSTL (the Ministry of Defence’s Defence and Science Technology Laboratory), who are an existing customer, Shenton … Continued

  • Case Study: Amazon Distribution Centres

    Client: Amazon Direct Sector: Distribution Location: Tilbury Products/ Services Background Amazon Direct is one of the largest distributors in the UK with over 30 warehouses operating currently. In 2021 an unplanned service requirement arose in one of Amazon’s distribution centres, which resulted in the requirement for a rental generator. Shenton Group were asked to provide … Continued

  • Backup Generator Solution for Ilona Rose House

    Client: Gratte BrothersSector: Mixed-Use Development Location: Soho, London Products/Services Background Ilona Rose House, set in the heart of Soho, London, is a 31,0,00sqm new-build project spread over 13 floors, including four below ground. With a build cost of £100m, the development will contain shops, restaurants, bars, offices, residential apartments, a gallery and a nightclub. Shenton Group … Continued

  • Providing Power Continuity to Virgin Media

    The Virgin Media Technology Service Centre, a campus facility in Knowsley, UK, was subject to technical upgrading of its supportive infrastructure to better enhance the power resilience to the site.

    The existing Diesel Rotary Uninterruptible Power Supplies (DRUPS) technology became extremely expensive to maintain, leading to the decision to upgrade the equipment. Shenton Group was once again entrusted with this project due to an ongoing relationship with previous power installations for Virgin Media.

  • W

    Wed, August 03, 2011 – Maintenance Manager – Food Manufacturer

    Wed, August 03, 2011 – Maintenance Manager – Food Manufacturer shentongroup Power Management’s service has been first class
  • W

    Wed, June 03, 2015 – Project Manager, Electrical Services Company

    Wed, June 03, 2015 – Project Manager, Electrical Services Company …we are very happy with the service you provided and I am sure the Hospital trust are as well. If we have any future projects requiring a generator I will be in contact with you…
  • D

    David Harbour – Andover Radio

    Sorry – but I can’t give Shenton a higher rating! They are simply superb. Nothing too much trouble.
  • B

    Building Service Manager – M&E Company

    Just so you know there wasn’t any issues with the generator and working with Alex was a pleasure. Found him very patient, understanding and helpful.
  • B

    Building Service Manager – Large M&E Company

    James, today’s training went well. Please let your mangers know Alex continued to be very thorough and professional when carrying out his work.
  • F

    Fri, April 26, 2013 – Civil Contingencies Officer, Council

    Fri, April 26, 2013 – Civil Contingencies Officer, Council The installation was successfully completed today, thanks to all concerned for your help, support, coorporation and coordination with this project.
  • M

    Mon, November 30, 2015 – Project Manager, Building Services Company

    Mon, November 30, 2015 – Project Manager, Building Services Company Can you please thank all you team for delivering this project yesterday to a successful conclusion. Our client and myself really appreciate all the efforts put in to this project.
  • W

    Wed, October 12, 2016 – Electrical Site Foreman, Building Services Company

    May I take this opportunity to thank you and your site team for the excellent service you have provided over the past 3 months at the **********. Special praise needs to go to Tom & Stuart who have shown true dedication and professionalism in delivering a successful project which at times has been a challenge!! … Continued
  • T

    Tue, November 08, 2011 – Engineer – Electrical Contractor

    Tue, November 08, 2011 – Engineer – Electrical Contractor A quick thank you with regard to the generator you supplied at the weekend. Eveything went like clockwork and all the pieces in the jigsaw fell into place. Again many thanks and next time I need anything like that I will be in touch.
  • F

    Fri, April 26, 2013 – Director, Consultants

    Fri, April 26, 2013 – Director, Consultants I take pleasure in writing formally to you for the very impressive performance provided by you and your company in delivering the new generator to the site. As you know our clients timescale for delivering this project was extremely tight in terms of both delivery and installation. Thanks … Continued
  • T

    Tue, October 16, 2012 – Solutions Engineer – Distribution Solutions Company

    Tue, October 16, 2012 – Solutions Engineer – Distribution Solutions Company Our customer has asked us to pass on our thanks to Norman for his help and support at the commissioning last Tuesday.
  • T

    Thu, November 01, 2012 – Technical Sales Engineer, Reseller

    Thu, November 01, 2012 – Technical Sales Engineer, Reseller Thank you for the professional quote sent in the post and the mints to go with. I’ve never seen anyone in the years I’ve been in this industry, send a quote quite like this. If the quotes are this good, service must be outstanding.